January to March had been fairly relaxing. The previous year and a half had been incredibly busy/hectic/stressful with planning and building the house and we thoroughly enjoyed our hibernation time in the new house over the winter. But now that Spring has sprung itself we were looking forward to getting outside and crossing a few things off of our to-do list.
I have to continually remind myself to: “Beware of the barrenness of a busy life.” -Socrates
Although we are going to be getting more projects done, we’re also trying to take things easy and be a little gentler on ourselves. There is really no rush or pressure to do anything at any specific time.
Still, the Spring/Summer To-Do list includes (but not limited to): backfill, grade, deck, plant grass seed, build garden fence, prep garden, plant garden, concrete patio, retaining wall, walkway, driveway, irrigation, dog run, general yard clean up, plant trees… I’m sure there’s more.
One of the first priorities was to get the deck built (it would make all of those other projects so much better by being about to recover on the deck after a hard days work). We elected to have our framing contractors come back to do it as soon as the snow and land was dry enough to start. The weekend before we had to backfill around the house as it had settled a lot over the winter. The wooden stairs we’d been using dropped at least 12″. And as the snow melted we had a mini waterfall along the side of the house.
It was gruelling and dirty work backfilling, shovelling, grading and tamping. We were fortunate enough to have our neighbour (best neighbour ever) offer to bring his payloader tractor over to help us out. We must have moved 20 yards of dirt that day.
We’d designed a BIG deck to take up most of the south side of the house with a size of 16’x40′ (about half the size of the house!).
I’d really wanted to have the deck clad in cedar, but the cost was absurd – exactly double the cost of treated lumber. I’m not a huge fan of treated lumber, but for 50% the cost, I can learn to live with it. Besides we would not be staining the cedar had we done it, so in 5-10 years treated and cedar look nearly the same – a light grayish colour.
The Monday after completing the backfilling the builders were able to come out. And by Tuesday evening, Darcie and I were having dinner on the new deck.
As we sat there on an unusually warm April evening, eating our dinner with our legs dangling off of the side of the new deck, drinking wine and looking out over the river, a bald eagle soared over our heads and into the distance. Both of us stopped and looked at each other, “Could this moment get any better?”
Continuing to enjoy your blog Kent…I have always felt the biggest mistake one can make when building a deck is not making it large enough…you passed the test…that deck is a beauty…really ‘grounds’ your amazing home.
LikeLike
Thanks Carmel!
LikeLike